St Elizabeth Rehabilitation & Nursing Center

Renovating the public areas of an occupied building is always challenging, but doing so throughout a multi-story structure occupied by the elderly and their caretakers is particularly so. Virtually every finish material for the renovation was either custom made for the project or purchased from vendors throughout the United States and Europe. The design intent for the renovations was that newly installed entryways into the resident rooms, hallways, and common areas would resemble their former homes and to create “neighborhoods” where the elders reside in a “person first” environment. Seven different pediment entries were all custom fabricated and received a different painted finish to create the appearance of a “neighborhood”. Work was completed to the resident entries and corridors without need for a single resident relocation. Each of the corridors was completely renovated with new wall coverings, new drywall bulkheads, and custom-designed residential-style lighting.

The existing nurses’ stations were converted to gathering areas, and custom built-in charting/med stations were relocated to newly created recesses within the corridors. CAM’s forces completely renovated the two day rooms on each floor, leaving one operational while the other was under construction. Warming kitchens were renovated and a new scullery to serve the kitchens constructed without interrupting meal service. Four bathing facilities on each floor were completely renovated with custom made, onsite cut, European ceramic tile, residential style lighting, towel warmers, and new bathing equipment

Elevator lobbies and common areas throughout the resident floors, as well as the main lobby, with its connecting hallways, were renovated without interruption to the daily activities of the facility. Work was conducted in multiple phases, day rooms were relocated, and the challenge of a schedule was slowed so as not to engender anxiety among the residents; all of these tasks were ably handled by CAM forces.

One particular challenge was the fact that the originally contracted design team defaulted as the project began, making CAM the de facto design/builder for the project.

The second part of CAM’s contract included the construction of the new outdoor pavilion directly adjacent the roadway leading to St Elizabeth’s main entry, which is used for parties and entertainment for the residents and their families. This new custom-built structure provides a sheltered area for entertainment and respite.

Waverly Elementary/Middle School

The new award winning Waverly PreK-8 School is a multi-phased, 3 story 130,000 square foot building including an 11,000 square foot underground parking garage. This LEED Gold Project was the first new Baltimore City School built in decades.

Special LEED features included a green vegetative roof, sunshades, extensive use of natural lighting, and high efficiency building systems. Post bid, CAM was requested to add Solar Panels to the facility, and in a design build delivery, ultimately chose to utilize roofs on both Phase 1 & 2 structures to optimize exposure.

The school houses an extensive media center, and a three story feature atrium entry which separates the cafeteria/auditorium and kitchen for community uses.

Architectural features include curved drywall and sloped acoustical ceilings, multiple styles of metal panels, a barrel vault metal roof, and two large skylights which provide natural lighting into the building core. Special attention was provided in this very tight occupied site to safely transition the middle and elementary students into this new facility.

Phase 1 of the new school has been constructed directly adjacent to the existing occupied elementary school and just across the street from the existing middle school and nearby residences.

Upon the completion of Phase I the elementary and the middle school students and administrators relocated into the new building during the winter break.

Dedication of the Phase 1 part of the school was held in early April 2014 and attended by the Governor, Mayor and other high ranking City officials who celebrated the first project being constructed under the City Schools’ aggressive program to improve their educational facilities.

Phase 2 added additional classrooms as well as a new gymnasium. The exterior of the gymnasium is adorned by relief art panels.

LSOP St. Martin’s Home

In early summer 2007, CAM was retained by the Little Sisters of the Poor as a Construction and Design Advisor for the construction of their new 180,000-200,000 square foot Provincial Home, one of only three in the US, serving the needs of the 80 residents, 20 Sisters, and the needs of the entire Eastern Province for the order.

Originally accepting the role as owner’s expert construction advisor, CAM would have been precluded from constructing the facility. Throughout more than 18 months of regularly scheduled design and planning meetings, CAM was an integral part of all discussions regarding programming, materials selections, budgets, cost analysis, parallel estimates, and value engineering. At CAM’s urging and advice, environmentally conscious materials and green building techniques were incorporated into the plans and program for the new structure. Plans for the new structure were halted at 100% design development drawings, and the Little Sisters of the Poor elected to renovate their existing occupied facility, hiring CAM as the Design/Build Construction Manager at Risk for the project. This faith-based home has required extensive pre-construction work to allow it to proceed to final design and construction, all completed at the originally quoted price. Multiple phases of construction have been added as contributions have been received to allow the project to proceed.

CAM aided the Sisters in preparation of an RFP for design services and selection of the team to complete this multi-year, multi-phased project. Challenges that CAM has overcome during this project include providing for independent and assisted living needs as well as those requiring skilled nursing care, with a convent for the Sisters themselves, while constantly evaluating cost and durability.

The 200,000 sq. ft. renovation project is planned for at least five phases, three of which are completed, including the complete design, the chiller replacement, and most currently, the renovation of four “cottages” totaling 56,000 sq. ft. as well as the renovations to 22,000 sq. ft. of the lower level’s laundry wing, boiler wing, corridors, and cottage mechanical rooms.

Phase IV work will renovate the large chapel, the convent, and the Postulate. Future plans include renovations to major administrative areas, creation of a new Main Street, and the balance of the lower level.

Like many faith-based retirement communities, St. Martin’s Home includes a chapel, an auditorium, dining rooms, a commercial kitchen and laundry, administrative areas that were quite expensive, a medical suite, offices for Social Services and physical therapy, a publication office, and a planned “Main Street” area, which contains resident amenities such as a game room, beauty salon, and gift shop. Construction costs for the complete renovation project are estimated at approximately $25 million.

Patuxent Institution – Kitchen and Perimeter Security

CAM successfully managed the renovations and new construction at this fully occupied, medium-security facility within the 40-acre security fencing. The project included construction of seven separate buildings, many of which were phased, occupied renovations, where CAM maintained excellent owner interaction to ensure uninterrupted facility use.

The seven-phase project within an occupied, operational correctional facility included importation and placement of more than 115,000 cubic yards of fill, installation of 7,000 lineal feet of 16-foot-high, double correctional facility fencing, a new sallyport, and two new 40-foot-tall brick, block, and concrete guard towers.

Renovations and construction also included new asphalt-paved parking for 700 vehicles, a 14,000-square foot visitors center and gatehouse, a 4,000 square-foot addition to an existing building, a and fully equipped, 15,000-square foot kitchen which, with its $1.5 million in detention-approved kitchen equipment, is operated in part by prisoners.

Building construction is brick, block, and concrete. This multi-phase, multiple-building project, within an occupied area, is evidentiary of CAM’s capabilities and represents one of the successful projects completed by the CAM/Bushey Feight Morin team.

Maryland Golf & Country Club

CAM was selected to provide Construction Management at Risk services for this multi-phased renovation and addition project. Services included: assistance with development of a long-range master plan, completion of a constructability study and associated value engineering, and selection of the Architect/Engineer team to implement the plans for renovating and adding to this fully occupied facility.

Renovations included expansion of the Ballroom, construction of the new locker room, expanded Golf Shops, and new Cart and Club Storage areas. Entries were required to remain open and operational in order for the Club to continue serving its members.

Value engineering efforts by CAM provided significant savings of approximately $300,000 from the original budget for the project.

Bid packages were developed to avoid duplication of work by the trades, the project was bid by multiple qualified trade contractors, and the renovations and additions were completed under CAM’s supervision. All work was completed while the facility remained fully occupied by members and guests, and the club’s calendar was not adversely affected by the multiple phased construction efforts.

Due to its complex phasing within the occupied facility and the high level of finishes required by country club construction, the project was recognized with an ABC Baltimore award for construction excellence.

1820 Lancaster Street – Union Box Co. Building

CAM Construction provided construction management and design/build services to Mason Dixon Capital Management for Lancaster Square in Fells Point. Savings of over 5% were achieved by utilizing the Construction Management Guaranteed Maximum Price delivery method. CAM utilized a value engineering process that permitted the project to proceed on a fast track basis to meet the developer’s needs.

The Lancaster Square renovation consisted of a group of five separate structures originally built in the 1880s and varying significantly in construction materials and floor plate elevations. The main building, The Union Box Co., is a timber-framed, three-story, 16,000-square foot brick warehouse. The other buildings are a two-story, steel-framed building, a two-story steel- and wood-framed building, and a 3-story brick townhouse.

Among the main challenges to this project was integration of the five structures into a single cohesive development while completely renovating the existing structures. The project called for major restoration including extensive masonry cleaning and re-pointing as well as cleaning and sealing the wood beams. The integration of the five structures unified 12 different roof elevations all of which were re-roofed and to which several large wood decks were added. Approximately 120 historic windows were replaced as part of the renovation.

Both a new five-story and three-story elevator shaft were installed within the existing footprint of the building. The project also added three stair towers, two of which were steel, and one was a concrete scissor stair.

As a part of the redevelopment, CAM constructed a three-story, light gauge addition between two irregularly shaped brick walls to integrate the structures. The project added another three-story addition that provides space for 10 luxury apartments atop the existing two-story structure.

At the main entrance a railroad motif with asphalt brick pavers, solid maple ties and stainless steel tracks lead visitors and residents from Lancaster Street to inside the Union Box Co. building. Once inside, the building glass walls seamlessly interface with the large wood timbers and provide aisles and office space while maintaining the historical character of the building. The apartment entrance is accessed through a large teak door flanked by tubular steel frames with stainless steel rods and an illuminated barrel vault canopy awning. The teak door gate is electronically interlocked with a secondary all-aluminum entrance at the other end of the courtyard, providing security for the apartment residents.

Lakeland Elementary/Middle School

The project was a multi phased renovation to renovate an existing 40,000 sq. ft. Baltimore City School and to bring its programs, life safety and major systems up to current standards. Work included renovations to the 1965 structure, a 40,000 sq. ft. fifteen classroom and media wing addition with ancillary spaces, brick masonry restoration and an addition to the gymnasium and kitchen.

All major systems were removed and updated, as were all finishes. The new elevator was installed within the confines of the existing building, providing a challenge to complete the work in confined quarters.  Once the project was fully underway, foundations for the new addition poured and shop drawings submitted BCPS elected to triple the size of the new addition.

CAM worked with the School Board on a CM basis to revise all pricing, complete programming, make proper changes to the building and to let contracts in the approved amount which would increase the size and value of the addition.

Albin O. Kuhn Library at UMBC

This 7-story 120,000 square foot, concrete-framed tower abuts the existing library with floor tie-ins at the 1st and 2nd levels. Construction included a 25,000 square foot renovation of selected portions of the existing library and moving all documents into the new tower.

The building exterior consisted of a complex system of pre-cast and curtain wall with granite accents. The interior has extensive millwork, terrazzo floors and ornamental stainless steel and glass rails. The building was completely internet ready with in-slab raceways to accommodate any future data cabling modifications.

This project required phased construction and significant pedestrian traffic control to allow continued safe and uninterrupted functioning of the existing library during construction.

Boyle Buick Renovations

This project involved extensive additions and renovations to the existing Boyle Buick flagship site. The exterior façade and entryway were improved with exterior column accents. Renovations were also made to the offices, engine bays, and waiting rooms.

All business operations continued without interruption during construction. As the owner stated, “keeping operations going is critical to auto dealerships”. The owner enjoyed our open-book delivery method and hands-on construction management approach.

“They were sensitive to our needs and worked with us to minimize the impact to our ongoing operations. In my business that is very important.” Chris Boyle- Owner