CAM values our subcontractors and provides this site to encourage you to bid with us. These files are provided as a supplement and are not a substitute for the original hard copy bidding documents. The hard copies of these documents are the only form of information that should be relied upon for contractual purposes. If you have any questions please call Chris Chesko at 410-560-2828 or email him at estimating@cambuilds.com.

Please Fax bid proposals to 410-560-1572. Please do not use email for bids.

We encourage subcontractors to join CAM Construction Bid list. Please fill out the Trade_Contractor_Form and return the completed document to estimating@cambuilds.com.


Projects Being Bid

BCPS – Replacement of Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and Holabird Elementary/Middle School No. 229

Number: 2017-06
Bid Date has Changed Now Bids are Due:  July 19, 2017 -5:00PM EST

Location:
  Graceland Park/O’Donnell Heights Elementary/Middle School No. 240: 6300 O’Donnell St. Baltimore, MD 21224 Map »
Holabird Elem/Middle School No. 229: 1500 Imla Street, Baltimore, MD  21224 Map »
Job Walk:  June 14, 2017 – 10:00AM EDT start at Graceland Park/O’Donnell Heights Elementary/Middle School No. 240

Pre-Bid RFIs Due:  July 5, 2017 – 5:00PM  EST
Expected Start (New School):  September 4, 2017
Expected Finish (New School):  June 30, 2019
School Demo:
  Aug 2019 – Dec 2019
Final Sitework:  Dec 2019 – June 2020
Architect:  Grimm & Parker Architects

Description:  This Bid is for the demolition and replacement of TWO (2) schools:
1) Graceland Park – O’Donnell Heights Elem/Middle School No. 240
2) Holabird Elem/Middle School No. 229
Both new schools will be 89,400 SF 2-story, K-8 schools, and will be built simultaneously. All major trades are involved including: hazmat abatement, demolition, sitework, concrete, masonry, steel, millwork, roofing, storefront, finishes, specialties, elevator, sprinkler, mechanical, and electrical.

Although drawings are very similar it is the trade contractors responsibility to determine scope of each project and bid accordingly.

THERE IS A JOB SITE WALK-THRU ON WED JUNE 14 AT 10:00 AM, STARTING AT GRACELAND AND THEN TO HOLABIRD (SEE ADDENDUM 3).

NOTE – FOR BOTH BUILDINGS: wage rates, unit prices, and alternates apply.

MBE REQUIREMENTS: MDOT  Total goal – 32%, with African-American (7%) and Asian (4%) sub-goals.

This project is also available for public bidding via the Cam Construction Public Plan Room.

Project Documents
Civil & Landscape – Graceland Bid Set-Drawings
Civil & Landscape – Holabird Bid Set Drawings
Architectural & Structural – Graceland Bid Set-Drawings
Architectural & Structural – Holabird Bid Set Drawings
Food Service – Graceland Bid Set-Drawings
Food Service – Holabird Bid Set Drawings
MEP – Graceland Bid Set-Drawings
MEP – Holabird Bid Set Drawings
Graceland Bid Specs Vol 1
Holabird Bid Specs Vol 1
Graceland Bid Specs Vol 2
Holabird Bid Specs Vol 2
Asbestos Management Plan for Graceland Park 240
Asbestos Management Plan for Holabird EMS 229
Addendum 1 to IFB17073 Graceland EMS240 and Holabird EMS229
Addendum 2 to IFB17073 Graceland EMS240 and Holabird EMS229
Addendum 3 to IFB17073 Graceland EMS240 and Holabird EMS229
Prevailing Wage Rates-Graceland Park #240
Prevailing Wage Rates-Holabird EMS #229
Bidding Data, General Conditions and Wage Scale for Graceland EMS240 and Holabird EMS229
Bid Form-MBE and Bid Data-Graceland EMS240 and Holabird EMS229
Addendum 4 to IFB17073 Graceland EMS240 and Holabird EMS229
Addendum 5 to IFB17073 Graceland EMS240 and Holabird EMS229 Addendum and Drawings
Addendum 5 to IFB17073 Graceland EMS240 and Holabird EMS229 NEW Asbestos Management Plan for Graceland Park 240_1c ­
Addendum 5 to IFB17073 Graceland EMS240 and Holabird EMS229 NEW Asbestos Management Plan for Holabird EMS 229_1c ­
Addendum 6 to IFB17073 Graceland EMS240 and Holabird EMS229 ­
Addendum 7 to IFB17073 Graceland EMS240 and Holabird EMS229   
Addendum 8 to IFB17073 Graceland EMS240 and Holabird EMS229
Addendum 9 to IFB17073 Graceland EMS240 and Holabird EMS229
Addendum 10 to IFB17073 Graceland EMS240 and Holabird EMS229
Addendum 11 to IFB17073 Graceland EMS240 and Holabird EMS229­ 
Addendum 12 to IFB17073 Graceland EMS240 and Holabird EMS229

 

 

 

 


Current Projects

Interior and Exterior Renovation of the Robert Poole School

CAM in association with the Baltimore City 21st Century School Program is seeking trade contractor pre-qualifications for bidding the Robert Poole School, 1300 W 36th Street, Baltimore, MD 21211.

The project includes interior and exterior renovation of the existing 65,600 square foot three story structure and gym wing and a new 73,100 square foot multi-story addition.

Certified Minority Business Enterprises are encouraged to respond to this solicitation notice.

The contractor or supplier who provides materials, supplies, equipment and/or services for this construction project shall attempt to achieve the MBE goals as follows: Total MBE=30%, with sub-goals: African-American=7%, Asian=4%. The bidder or offeror acknowledges the requirements of the MBE Participation and the MOED Workforce Development Programs, and will submit their completed forms accordingly.


1-Robert_Poole_CAM_Construction_Bid_Manual
2-Robert_Poole_Spec_vol_1_033116

3-Robert_Poole_Spec_vol_2_033116
4-Robert_Poole_Spec_vol_3_033116
5-Robert_Poole_Bid_Dwgs_vol_1_033116
6-Robert_Poole_Bid_Dwgs_vol_2_033116
7-Robert_Poole_Ex_Dwgs_Originals_056-1922

8-Robert_Poole_Ex_Dwgs_Building_Additions_056-1933
9_Robert_Poole_ADDENDUM_NO_1
10-Robert_Poole_ADDENDUM_NO_2
11-Robert_Poole_ADDENDUM_NO_3
12-Robert_Poole_ADDENDUM_NO_4
13-Robert_Poole_ADDENDUM_No_5
14-Robert_Poole_Conformed_Set_Dwgs_vol_1_NoLandscape_072816
15-Robert_Poole_Conformed_Set_Dwgs_vol_2_072816
16-Robert_Poole_Conformed_Set_Dwgs_Landscaping_080816

17-Robert_Poole_ADDENDUM_No_6

 

Little Sisters, St. Martins Home, Main Street Renovations

The scope of work for this phase includes the Renovation of Main Street which includes raising the roof structure and replacement of the flooring and window system for the first floor corridors. The facility is occupied though Main Street will be vacant. This is a Tax Exempt project. Auto Temperature Controls are to be provided by Johnson Controls. Fire Alarm is to be provided by Alarmtech Solutions.

Bid Documents

LSOP_MainStreet_drawings 25,456KB
LSOP_MainStreet_specifications 7,345KB
LSOP_MainStreet_addendum 1  580KB
LSOP_MainStreet_addendum 2  2,510KB
LSOP_MainStreet_addendum 3  1,153KB
LSOP_MainStreet_addendum 4  938KB
LSOP_MainStreet_Conformed_revised_drawings_052516 24,883KB

St Martin_historical drawings 147,257KB

Youth Detention Center

33,000 sqft addition & two 6,500 sq ft additions.

 

Youth Detention Center Conformed Drawings_040315 Vol 1 clearclear
Youth Detention Center Conformed Drawings
040315 Vol 2clearclear
Youth Detention Center Project Manual Conformed 040315clear

Youth_Detention_Center_Vol-1_drawing
Youth_Detention_Center_Vol-2_drawing
Youth_Detention_Center_Add_1
Youth_Detention_Center_Add_2_021315
Youth_Detention_Center_Add_3_022015
Youth_Detention_Center_Add_3_022015_attachments
Youth_Detention_Center_Add_4_030215
Youth_Detention_Center_Add_5_030515
Youth_Detention_Center_Add_6_030915

Goucher College New Interfaith Center


Location:      1021 Dulaney Valley Rd, Towson, MD 21286 Map »
Budgeting:   This project is for budget pricing.
Budgets Due:  May 18, 2017 – 5:00PM
Expected Start:   September 2017       Expected Finish: May, 2018
Architect:    Ayers Saint Gross
Description:  CAM Construction is the Construction Manager for this new 7,500 SF building addition at Goucher College in Towson, MD. We are requesting subcontractor participation in pricing the 50% CD documents contained in this Invitation to Bid. Participating subs will be strongly considered during the Final Bid phase in June 2017.

The project includes a 3-story Addition and minor Chapel Renovation, with the following major trades: demolition, sitework, landscaping, concrete, gypsum floor topping, masonry, stone veneer, steel, wood framing and trusses, millwork, waterproofing, roofing, doors and frames, aluminum entrances and storefront, finishes, specialties, window treatment, elevator, sprinkler, mechanical, and electrical.

Download the documents below

Goucher – Goldsmith Interfaith Center Project Manual CD50
Goucher – Goldsmith Interfaith Center Full Set Drawings CD50
Goucher – Goldsmith Interfaith Center Site Drawings CD50
Goucher – Goldsmith Interfaith Center Struct.Arch Drawings CD50
Goucher – Goldsmith Interfaith Center MEP Drawings CD50
Existing Chapel Drawing Set

 

 

St. Martin’s Home -Lobby Renovations and Canopy Addition

Location:      Little Sisters of the Poor, 601 Maiden Choice Lane
Bids Due:  changed to Jun 13, 2017 – 3:00PM EDT
:  May 25, 2017 – 10:00AM EDT
RFIs due:  May 29, 2017 – 12:00PM EDT
Expected Start:   Jul 5, 2017       Expected Finish: Feb 5, 2018
Architect:    Gaudreau Architects
Description:   Renovation of main entrance lobby which includes removal and raising of roof structure, temporary entrance, and replacement of entrance canopy including associated site work.

LSOP Lobby Complete Specs 051717
LSOP Lobby Complete drawings 051717
LSOP Lobby Addendum 1 060217
LSOP Lobby Addendum 2 060817 ­

LSOP Lobby Conforming drawings 080217