BALTIMORE BUSINESS JOURNAL: BALTIMORE DISTRICT COURTHOUSE

The Baltimore Business Journal recently published an article on the extensive renovations that are underway at the Baltimore City District Courthouse on 500 N Calvert Street. The article details the work planned for the approximately 170,000 square-foot courthouse. Subscribers of the BBJ can check out the article at the link below-
https://www.bizjournals.com/baltimore/news/2023/05/24/baltimore-city-district-court-construction.html

BREAKING NEWS! AN EAST BALTIMORE LEGACY CONTINUES

CAM Construction is honored to have attended the Chick Webb Recreation Center Groundbreaking Ceremony with Councilman Stokes, Senator McCray, Mayor Scott, Recreation & Parks Director Moore, and Housing Commissioner Kennedy—all of whom were instrumental to securing the necessary federal funding and CHAP designations to protect the rec center’s future as a free, public institution. This project, which is deeply embedded in the history of East Baltimore, serves to restore a critical facet of the community and honor the legacy of legendary Baltimore drummer William Henry “Chick” Webb and Dr. Ralph J. Young. The East Baltimore community descended upon the groundbreaking in full force, with many sporting various shirts and signs that depicted both their love for the area their excitement for the work to come. Upon completion in Fall 2025, this $16 million wellness facility will offer new basketball courts, a fitness studio, swimming pool, and even a recording studio (in memory of Chick Webb), providing a space for the neighborhood to congregate in performance, play, and education. Special thank you to our partners at GWWO Architects for providing renderings for the future facility!

DEMO TIME: District Courthouse Transformation

This $68,000,000 project will transform the existing five-story, 170,000 SF State of Maryland facility into the New Baltimore City District Court.  The overhaul includes not only new mechanical, electrical, and security systems, but it also replaces the existing 1980’s era brick façade with a contemporary glass, curtainwall, and metal panel façade. A complete interior renovation will include eight new courtrooms and Judges Chambers, clerk and other support staff areas, a record-keeping area, and separate and secure access for judges as well as for the accused.  From the retrofitted deep foundations to the 22,000 SF of green roof, this building will undergo structural, aesthetic, and sustainable upgrades to bring this building into the 21st century.

MUST SEE: Drone Fly-Through Video of Highlandtown EMS

It’s our pleasure to share this great drone fly-through video, produced by 21st Century Schools, showcasing the $22 million Highlandtown Project! Lots of natural light, beautiful ceiling details, and a seamless transition from the historic facility into the newly constructed Middle School wing (both inside & out). The school boasts new science labs, art studios, music room, and a makerspace/tech lab. Outdoor spaces include an all-new playground and recreational soccer field, fulfilling a long-held vision of the community that emerged as a priority during early planning meetings! Shoutout to John Srygley on another sharp design.

Scenes from the Ribbon Cutting at Montebello Elementary/Middle

A buzz of excitement was in the air as CAM wrapped up 2022 by hosting two major ribbon cutting ceremonies IN ONE WEEK, showcasing our recently completed 21st Century Schools Projects: Highlandtown Elementary/Middle and Montebello Elementary/Middle! We were overjoyed to have the chance to unveil these beautiful new facilities to the throngs of students and parents, eager to explore their new classrooms, libraries, dining halls, and collaborative learning spaces. Special thanks to leaders like Governor Larry Hogan, Senate President Bill Ferguson, Mayor Brandon Scott, Council President Nick Mosby, Principal Denise Ashley, Principal Troy Mitchell, and other city advocates who were instrumental in getting these plans approved, who came out to celebrate the momentous occasions and tour the final product.

What better feeling than to give over 1,400 young students the gift of a brand new school for Christmas! Certainly much more work to be done, but together we can change the lives of Marylanders for the better, one building at a time.

CAM Turns 60!

CAM celebrated our 60th anniversary at our annual Holiday luncheon, held with some of our office staff this afternoon at BCC Roland Park. Our firm was founded in Baltimore, Maryland on August 8, 1962, by Angelo F. Munafo, and has continuously operated as one of the cornerstones of the local construction industry to this day. Merry Christmas, Happy Holidays, and Happy New Year from all of your friends at CAM!

Montebello Transformation Featured in the BBJ

Melody Simmons, commercial real estate reporter with the Baltimore Business Journal, just published an excellent article in the BBJ following her tour through our recently completed Montebello Elementary/Middle School project in Central Baltimore.

CAM was proud to be a part of a ribbon cutting ceremony with Mayor Brandon M. ScottMichael Frenz, and so many other dignitaries yesterday! An incredible transformation and example of historic preservation, while incorporating modern finishes and cutting edge technology throughout the facility. The exterior design of the building is emblematic of the historic architectural style of the surrounding neighborhood, so the city committed to restoring the facades back to their original luster, while giving its design team the creative liberties to redevelop the interior of the facility has beyond recognition–optimized for modern occupancy! The stately character of the Field House is one area where Todd Vukmanic & his architectural team were really able to marry the exposed historic elements with the needs of today’s student athletes, performers, and general assemblies.

Executing the rear cafeterium addition, playground, and outdoor classroom spaces proved extremely challenging, given the constrained site conditions and limited points of access into the building for equipment and materials. Contending with steep slopes, working around historic window openings, maximizing views of the lake, and re-imagining the existing floorplates into a 21st Century learning environment proved a rewarding and challenging endeavor for our project management staff and the visionary team at Crabtree, Rohrbaugh & Associates. Moreover, redirecting pedestrian and vehicular traffic patterns along Harford Road, E. 32nd Street, and Curran Drive added to the complexities of managing this job. Shoutout to our PM, Vince Culotta, our Superintendent, Jeff Schissler, and Justin Wood at MSA for all their hard work on this one over the past two years.