Bay Brook EMS Achieves LEED Gold Certification!
CAM Construction was the Construction Manager for the Bay Brook Elementary/Middle School replacement project, which just achieved LEED Gold Certification. The Gold Certification exceeded original program requirements of LEED Silver for this project.
There were a number of innovative Green Strategies used during both the design and construction phases of Bay Brook’s project.
Here are some of the quantifiable GREEN ACHIEVEMENTS from the project:
83% – 83% of demolition and construction debris was diverted from disposal in landfill through either recycling or salvaging.
39% – Due to the optimization of its HVAC system and lighting equipment, Bay Brook achieved a 39% energy use reduction on an annual cost basis compared to a typical baseline building of similar design.
38% – Through the installation of efficient water fixtures, Bay Brook achieved a 38% reduction in water use compared to a typical baseline building of similar design, on an annual basis.
23% – To cut down on needless transportation emissions, 23% of the project’s total material costs were spent on building materials that were extracted/harvested and manufactured within 500 miles of the project site.
17% – 17% of the project’s total materials cost were spent on building materials with recycled content.
Brochure created by Lorax Partnerships, LLC
CAM receives a 2019 ABC Award of Excellence in Construction!
ABC Excellence in Construction Awards –
CAM Construction receives two awards, one award of Excellence!
Bay Brook Elementary Middle School was awarded Excellence in Construction, while the Perimeter Security & Lobby Renovation project at Chesapeake Employers Insurance Company received a Merit Award.
Even as the banquet has been postponed, we want to thank everyone that played a critical role in in these project’s success.
Bay Brook EMS
New Construction | Replacement Facility :
Maryland Stadium Authority
Baltimore City Public Schools
Crabtree, Rohrbaugh & Associates – Architects
Chesapeake Employers Insurance Company
Perimeter Security & Lobby Renovations:
Chesapeake Employers’ Insurance Company
Johnson, Mirmiran & Thompson
Take A Virtual Tour – Bay Brook Elementary Middle School Opens!
Take a virtual tour! Our team recently celebrated the ribbon cutting and completion of Bay Brook Elementary Middle School in Baltimore, MD.
This replacement school was constructed on an accelerated timeline so that Baltimore City Public Schools could occupy the building after the winter break. A combination of excellent plans, team cooperation and experience, generated over $1.5 million in savings to the owner.
The new 116,000 sf, 800 student facility is designed to promote flexible and interactive learning environments. All three classroom wings, P-K through 2nd grade, 3rd through 5th grade and 6th through 8th grade, contain dedicated Collaborative Learning Areas which are centralized to make the spaces open and easily accessible. Larger core-curriculum spaces consisting of the Cafeteria/Dining, Media Center, Administration, Gymnasium, and Community Space are located on the first floor.
We would like to thank the Maryland Stadium Authority, 21st Century Schools, Crabtree, Rohrbaugh & Associates – Architects, and everyone that contributed to this project’s success!
CAM completes Perimeter Security & Lobby Renovations at Chesapeake Employers Insurance Company
Our team completed the building security and site perimeter renovations to Chesapeake Employers’ Insurance Company‘s building in Towson, MD.
This project incorporated the removal and replacement of all first floor glass with the installation of specialized high-grade security glazing. All parking garage security screening was replaced with anti-theft wire mesh/framing.
We also renovated the offices on the first floor and relocated the security station to a new secure vestibule, all while the building remained occupied and fully functional.
Architect: JMT Architecture
CAM Construction Ranked #9 – 50 Fastest Growing Private Companies in Baltimore
Our team was honored to accept the #9 ranking at the Baltimore Business Journal‘s (BBJ) – 50 fastest-growing private companies event. This year’s list ranked companies by the highest average percent change in revenue between 2016 to 2018.
During this period, CAM provided pre-construction, cost estimating, construction management, & general contracting services to private, non-profit, and public project owners.
This recognition included the historical renovations & additions to the Robert Poole Building, Pontiac Mills Apartment & Retail historical restoration, and the new construction of two Net-Zero Elementary Middle Schools.
Robert Poole Building Achieves LEED GOLD Certification!
The Robert Poole Building project has achieved a LEED Gold certification! Below is the project’s case study.
Baltimore City’s First Net Zero Energy Buildings
Here is an informational video by Grimm + Parker Architects, showcasing two of our educational projects within the Baltimore Community.
Graceland Park/O’Donnell Heights & Holabird Elementary/Middle School will be the first NET ZERO ENERGY buildings in Baltimore City, providing state-of-the-art 21st century learning environments for Baltimore City Public Schools.
These prototype schools demonstrate Baltimore’s focus on project based learning, sustainability, and energy conscious schools in urban environments. Stay tuned for more updates, including the Insulated Concrete Forms (ICF) installation.
Video Credit: Graceland Park/O’Donnell Heights + Holabird Elementary/Middle School from Grimm and Parker Architects.
Robert Poole Building to Open for Upcoming School Year
The Robert Poole Building is home to The Academy for College and Career Exploration (ACCE) and The Independence School, a project within the 21st Century School Buildings Plan. This project renovates the original historic building and demolishes several later, outdated additions, replacing them with two new additions.