PROJECT SUMMARY:
The work consists of steel bearing superstructure, metal deck, restoration of existing masonry and masonry veneer, membrane roofing, aluminum storefront, doors, frames, hardware and interior finishes (flooring, drywall, paint. Specified mechanical façade at the new addition.
The school will not be occupied during construction. Work of the project will occur in multiple phases. Generally, the new construction consists of steel bearing superstructure, metal deck, single-ply membrane roofing, d/f/h, aluminum storefront systems, and interior finishes along with the specified mechanical, electrical, plumbing and fire protection systems.
This project is designed and shall be constructed to achieve LEED Silver certification.
NOTE:
ALL BIDDERS ARE TO RECEIVE THEIR FORMAL INVITATION FROM CAM’s WEB BASED SYSTEM – BUILDINGCONNECTED. THIS WILL ASSURE THAT ALL DOCUMENTS AND ADDENDA ARE VIEWED BY BIDDERS, AS THIS INFORMATION IS CURRENT AND WILL BE THE BASIS OF YOUR PROPOSAL. PLEASE CONTACT CAM CONSTRUCTION BY EMAIL – ESTIMATING@CAMBUILDS.COM – TO OBTAIN A FORMAL INVITE, IF NOT ALREADY RECEIVED.
ALL BIDS MUST BE SUBMITTED ON THE BID FORM AS IDENTIFIED IN SECTION 003000 FORM OF PROPOSAL.
MDOT certified Minority Business Enterprises are encouraged to respond to this solicitation notice.
The project has an overall MBE participation goal of 30% inclusive of 11% Woman Owned and 8% African American sub-goals. MBE and Workforce participation will be evaluated as part of the award. Prevailing Wage rates will apply.