The Work consists of the addition of a 45,000 Sqft educational wing addition, renovation of the existing cafeteria and IT/Data upgrades throughout the existing facility. The addition is a three-story addition steel framed superstructure, metal deck, CFMF exterior walls with brick veneer. The school will not be occupied during construction. Site work will consist of new storm water and structures, paving and sidewalk replacement. New playfield and site features are also identified. Other building features are new Aluminum Storefront, TPO Roofing System and interior finishes along with the specified mechanical, electrical, plumbing and fire protection systems. The Project is designed and shall be constructed to achieve LEED Silver certification.

BUILDINGCONNECTED.COM IS USED FOR DISTRIBUTION OF ALL BID DOCUMENTS (INCLUDING ADDENDA), AND CRITICAL INFORMATION DURING THE BID PROCESS. RESPONDING “INTERESTED” OR “BIDDING” TO THE ITB THRU THE WEB-BASED SYSTEM ENSURES YOU WILL RECEIVE ALL DOCUMENTS AND CORREPONDENCE FOR PROJECT WHILE ALSO PROVIDING YOU THE OPPORTUNITY TO MESSAGE US DIRECTLY. IF YOU ARE NOT INTERESTED, RESPONDING AS SUCH WILL ELIMINATE ALL FUTURE MESSAGES REGARDING THIS PROJECT.

 

REMEMBER THAT BUILDING CONNECTED IS A SYSTEM WHICH ONLY ALLOWS YOU, THE SUBCONTRACTOR TO UPDATE COMPANY INFORMATION. PLEASE TAKE A FEW MINUTES TO UPDATE CONTACT NAMES, EMAIL AND PHONE NUMBERS TO ENSURE THAT YOUR COMPANY IS GETTING ALL ITB’S AND CORRESPONDENCE WHICH IS INTENDED FOR YOU

MDOT certified Minority Business Enterprises are encouraged to respond to this solicitation notice. The project has an overall MBE participation goal of 30% inclusive of 11% Woman Owned and 8% African American sub-goals. MBE and Workforce participation will be evaluated as part of the award. Prevailing Wage rates apply.