Maryland Institute College of Arts (MICA) – Accessibility Survey

MICA commissioned GWWO Architects to perform a facilities assessment that resulted in a digital project planning deliverable. GWWO hired CAM to perform an integral part of to the scope, Order of Magnitude Cost Estimation and with detailed feedback and analysis.

Our team supported GWWO throughout the project and completed a detailed PDF analysis of the facilities, which was incorporated within GWWO’s assessment.

LSOP Mainstreet Renovation

The renovation to the “Main-Street” facilities at the Little Sister’s of the Poor – St. Martin’s Home campus required CAM to raise the existing roof structure within the middle of an occupied facility, and provide a new library, salon, community store, coffee shop, formal dining facility, and common areas. In addition, our team renovated all main corridors within the facility and completed a full mechanical and electrical system extension and upgrade.

In similar nature to the previous phases, the building remained occupied and fully functional throughout the project.

 

 

The Ridge at Ruxton – Subdivision & Private Residence

Historic restoration and an adaptive re-use project of a registered Historic property, were the focal points of The Ridge. This late nineteenth century Beaux Artes Mansion was designed by Baldwin & Pennington and was built by John Stack & Sons. Originally a 28-room residence that was later turned into a school for handicapped children, CAM returned The Ridge to a private residence and won numerous awards for our efforts.

This project required removal of lead-based paint and asbestos, installation of a heating system, and the design and installation of the home’s first air conditioning system, which were installed with no disruption to the historic interior fabric of the home. The project also included restoration of the plaster walls, ceilings, and crown moldings, restoration of the interior shutters, and a complete restoration of a two-story tower, replete with brick, terra-cotta, metal cornices, lead coated copper, slate roofing, etc.

Pontiac Mills Commercial Space

The Pontiac Mills Development is the adaptive reuse of more than 20 separate historic textile mill buildings into a mixed-use complex comprised of both office/retail and residential rental apartments. This historic textile mill complex was the original producer for Fruit of the Loom textile and garments.

Approximately 135 apartments and 50,000 SF of office/retail space will be developed within the existing mill complex along the banks of the Pawtuxet River in Warwick, Rhode Island.

Work on the development began in 2016 and will encompass the renovation of approximately 200,000 SF, with first occupancy in 2018 and all phases completed by 2019/2020. The estimated cost for the entire project is $35,000,000.00. The project has been approved as an historic structure/complex from both the State of Rhode Island and the National Park Service. Pontiac Mills, originally built in 1863, has been declared a Nationally Registered Historic District, and will utilize various state and federal tax credit programs.

Robert Poole Building

The Robert Poole Building is home to The Academy for College and Career Exploration (ACCE) and The Independence School, a project within the 21st Century School Buildings Plan. Our team partnered with the Maryland Stadium Authority, Baltimore City Public Schools, & JRS Architects to provide pre-construction & construction services to this historic building.

This project renovates the original historic building and demolishes several later, outdated additions, replacing them with two new additions. Construction began in August 2016, and was completed for the start of school in August 2018. Key features include 72,044 sf of renovated space including the Media Center and CTE Labs, with another 63,852 sf of new construction. The new portion of the building contains a state-of-the-art Gymnasium, Art & Music Classrooms, and a Collaborative Learning Stair.

A dedicated entrance for community space leads to 1,980 sf featuring a large meeting room, career readiness room, food pantry, and a laundry center. In addition, there are two new greenhouses available for student use.

Thoughtful design allows for the building to maximize daylight in instructional areas, including the new collaborative learning areas, while there is a clear circulation path for wayfinding and security.

The renovated facility will gracefully transform an iconic building in the Hampden neighborhood into a true 21st century school.

Youth Education and Rehabilitation Center

 

The Youth Education and Rehabilitation Center (YDC) is a 81,000- square foot facility that houses 60 detainees and is located on Greenmount Avenue in Baltimore. Located at the northeastern corner of the Correctional Complex campus, the facility comprises new construction and renovated areas formerly occupied by the Baltimore Pre-Release Unit. The new construction was in place of the main facility of the Baltimore Pre-Release Unit, which was demolished for this project. The area that was renovated was part of a former warehouse building.

The YDC is a dedicated pre-trial facility for youths that provides the extensive support services required of a juvenile population, including a full educational program operated by Baltimore City Public Schools. The facility also includes medical and mental health as well as athletic/recreational spaces geared toward the specific needs of a youth population.

The pre-trial center will provide educational and service benefits to its occupants. This new center will provide the mandatory sight and sound separation from the adult population, while allowing the occupants to take part in an educational program operated via Baltimore City Public Schools. Before this facility, the youth population was detained with hardened criminals, as they awaited trial without the ability to take part in educational and rehabilitative services.

The educational wing separates the school from housing, which will increase a sense of normalization for the youth population. With spaces like state-of-the-art classrooms, a full-sized gymnasium, art-room, media center, and collaboration centers, this facility will focus on educating and rehabilitating rather than just housing its occupants.

The building offers the ability to provide a full assortment of medical servicing capabilities. The facility includes a medical infirmary, full dental clinic, exam rooms, isolation rooms, psychology and behavioral health services and dialysis, and a spacious waiting area within the medical wing. This medical/health wing was designed and constructed around the specific needs of a juvenile population.

The facility achieved LEED Gold certification. A few of the integrated sustainable features include urban site selection and site density, reduction of water usage, a highly efficient building envelope, high-performance HVAC systems, efficient LED lighting sources, and recycled or readily renewable materials and finishes.

 

 

Hereford HS Renovation & Addition

This 188,000 square foot renovation and addition project was scheduled for twelve distinct phases and necessitated double shift work for over two years. The tightly scheduled project also  remained occupied throughout its duration.

Due to the complexity of the job, the aggressive schedule and the sheer acreage of the facility, CAM managed the renovation, the addition, the site work and the creation of a new pre-treatment waste water facility as four individual sub projects. Each of these sub projects had its own shifts and crews.

For nearly the entire duration of the project, the renovation required that CAM work two full shifts during all times when the school was closed to mitigate any impact to the administration and student population. The day shift proceeded form 7 a.m. to 3:30 p.m. while the second shift worked from 3 p.m. to 11 p.m. The second shift included an entirely different workforce and superintendent who worked closely in concert with the day shift superintendent.

This twelve-phased 143,000 square foot renovation included remediation of asbestos and removal and disposal of PCB ballasts. Renovations also included demolition throughout the school, installation of all new finishes and fixtures, new casework and classroom accessories and work to the mechanical, sprinkler and electrical systems.  Tightly coordinated phasing mandated that work be completed for the students to return to the renovated classrooms in accordance with the schedule. Parts of the building were vacated during breaks which allowed for unimpeded progress in some areas.

The addition was primarily constructed during the day shift.  It consisted of a new three-story, 45,000 square foot building with a cafeteria and STEM science addition. The addition is connected to the existing building via a new enclosed second floor bridge link.  The new structural steel, brick and cast stone structure also creates the new feature entry into the school.  Upon completion of the new addition and entry, the school moved into the new spaces while the renovations and site work continued.

The addition includes a new cafeteria with a full service kitchen, pantry and serving areas, eleven new Biology classrooms, Chemistry and Physics laboratories with prep and storage rooms, restrooms, offices and circulation areas.  Science casework, shelving and fume hoods as well as extensive IT requirements differentiate these spaces from typical high school classrooms.  A new HVAC system was also installed that includes a two pipe chilled water system and boiler.

The site work on this 270 acre facility was also primarily performed during normal working hours.  Additional night shifts were incorporated during work which required tying in to the existing electrical infrastructure. Site work also included extensive grading, paving for roadways and parking lots, and the installation of utilities and drain fields.

Twelve new storm water management ponds were also installed adjacent to five athletic complexes all of which needed to remain operational throughout the school year and for scheduled recreation programs during the summers and school breaks.

The fourth sub-project represented the construction of a new waste water/pre-treatment facility. The facility has the capability of handling 10,000 gallons/day.  In addition to serving the school as a waste water treatment plant, the building also serves to house and care for livestock associated with the school’s agricultural program.

During the entire project CAM managed logistical challenges as well.  Since there was only a single entry and exit to the school and site, deliveries were tightly coordinated with the 40 school buses and student and staff vehicular traffic. Materials for the project could only be received during specific windows of time which varied with the school’s event calendar.

Despite nearly three years of continuous construction activity, major school activities including concerts, proms and athletic activities were incorporated into the schedule and proceeded without interruption.

Rombro Loft Condominiums

Converting a historic, six-story, inner city office building into 17 condominium apartment units presents many challenges, particularly when the first floor of such a structure remains occupied as a functioning dialysis clinic throughout construction.

When the building was once home to the Baltimore Office of the Bureau of Tobacco and Firearms, complete with lightweight concrete floor topping, surveillance equipment, and reinforced drywall partitions, the task becomes even more challenging.

CAM Construction was employed as the Construction Manager at Risk for the project and aided in keeping the tight budget controlled and constructed many of the units with loft areas, high-level finishes, and appliances.

Storefront windows were replaced to provide operable window units with appropriate profiles, and the common areas were all completed without interruption to the ongoing work of the clinic. The award-winning building provides affordable housing to Baltimore residents and is another outstanding effort for the West Side Redevelopment of the city.

Injured Workers Insurance Fund – Headquarters

Executives and employees at the six-story, 80,000 square foot facility had several problems. There was a severe shortage of parking spaces for their employees and guests, the interior elevators were older and deliveries needed to be brought through the lobby, the finishes and office furniture were outdated, and most importantly, the HVAC system did not work properly. Specifically, the office areas above the parking garage were so cold in the winter that no one could work in the area.

IWIF employed CAM as a CMaR to aid them in resolving these issues, hiring a design firm and completing the construction within their occupied offices. A new 165-space parking lot was constructed adjacent the building, complete with decorative fencing, retaining walls and a remodeled entryway into the building. The new elevator was construed within a building addition that provides access for both employees and deliveries to each of the floors. The HVAC problem was alleviated by a newly designed system and was installed while the building was being renovated.

The ultimate challenge to this project was that the building remained occupied throughout construction. The lobby and each floor were renovated individually, employees relocated, office furniture deliveries were coordinated to meet the floor by floor renovation, cut-throughs were made to the floors for the elevator access, and the unused first floor auditorium was converted into usable office and conference space. Complex cabinetry and millwork create an outstanding executive and boardroom area. All work was completed without disruption or loss of work time for the IWIF employees.