Montebello Elementary/Middle School

The Montebello Elementary/Middle School project encompassed a 74,000 sf systemic renovation and complete interior gut of a historic school property, restoring the two existing buildings back to shell condition and then constructing all new improvements throughout. There was both a historic restoration component on the exterior of the existing structures, as well as a compatible newly constructed “cafeterorium” wing (20,000 sf) which had to be nestled within this confined site and communicate seamlessly between multiple distinct floor elevations, with the help of a brand new ADA stair tower.

One of the main goals of the project was to undo a series of inconsistent, incompatible renovation efforts over the decades, while highlighting the original architectural features of the building through a variety of restoration and reconstruction efforts:

  • new architectural shingled roofs
  • rounded architectural bronze gutter and downspout system to match the historic copper material salvaged on the field house
  • basketweave masonry restoration and cleaning of the architectural stone, steps, columns, balustrade, needlepointing, and school name engraving
  • replacement of over 300 existing windows with aluminum clad window systems to replicate the style and light pattern of the remaining historic windows
  • capture traditional stone archways and architectural features at the entry canopy through the second floor windows of breakout areas as well as a classroom and “wholeness” room
  • gym renovation repurposed existing stage façade, brought out the elegance of the arched windows, and dropped a drywall ceiling beneath the formerly exposed girder trusses to conceal new HVAC and improve acoustics for the space’s theatrical/assembly functions.
  • Renovated internal stairwell in the rear, with sweeping views overlooking Lake Montebello
  • Expansive city views out of collaborative learning areas as well as classrooms, overlooking 33rd street toward City College, the old Memorial Stadium site, and row homes rising up the hillside towards the horizon

This job contained a few unique features for a PreK-8th school, such as a locker room, hybrid library-media center with bulkhead accent lighting, and a video production studio with greenscreen, display mounting racks, and hookups for an iMac editing booth. One core component of this job was the construction of a $2 million state of the art kitchen with large walk-in refrigerator-freezer boxes, steam/convection ovens, stovetop, boiling hot water vats, warmers, automatic dishwashing equipment, and two individual serving lines to serve the brand new cafeteria (which doubles as a multipurpose room). Tall ceilings, architectural accent lighting, acoustical panels, and an extensive sound system make this space suitable for performances, community meetings, and other events. Finally, CAM executed the construction of a very difficult outdoor learning area between the new and historic buildings, installing planter beds, wide concrete seating, and staircases for students to congregate and classes to be held outdoors in good weather. We had to contend with a ten-foot elevation change spanning a distance of less than twenty feet within this newly formed courtyard.

By no means was this an easy undertaking for the A&E team or CAM, as this site presented a number of inherent obstacles given existing conditions. Challenging features included steep slopes (50’ drop from Harford Road to Curran Drive), outdoor learning areas and playgrounds wedged between structures, inserting state-of-the art mechanical equipment within restricted spaces (former boiler rooms), and a bulkhead pocket detail around all historic window openings (to preserve original dimensions, enhance natural light/views, while concealing new ceiling cassettes within modern drop ceiling systems). Thoughtful sequencing and stocking of materials in the building was necessary to sustain progress despite having a single access lane for supplies and crane mobilization.

Highlandtown Elementary/Middle School

The Highlandtown Elementary/Middle School project involved renovating the existing 75,000 square foot historic school building and constructing a 45,000 square foot ground-up classroom addition, which effectively doubled the enrollment capacity of this site. The project also involved a variety of site improvements, namely a multi-purpose soccer field (satisfying a major community priority), new parking/loading areas, a playground within a newly created courtyard area, and various fencing, sidewalk, and other frontage improvements to enable students’ ability to take advantage of the shaded front yard space. JRS Architects took a clean modern approach to the design of the new middle-school wing with modern finishes and a sleek commercial glassline to seamlessly integrate with the existing masonry façade of Highlandtown Elementary School. Expansion of the PreK and Kindergarten programs was another key goal of this project, creating vibrant interactive learning environments with multiple flexible teacher’s stations and private kiddie restrooms in each home room.

Prominent new features of this “21st Century Schools” project included advanced lighting controls with occupied sensor modes, which adjust as outdoor lighting conditions change, “One Screen” smart boards with integrated pointers and teacher microphone system in every classroom, A/V boxes hidden above dummy ceiling tiles, and all new internet service tying into BCPS’s citywide emergency response network (with repeaters in each classroom). CAM also established dedicated vocational-tech (R&D) rooms with reeled power chords, eyewash stations, and an equipment storage room, allowing students to experiment with robotics and other power tools to gain exposure to engineering and related trades. Additionally, the job provided new art classrooms with extensive casework, drying racks, and kiln rooms, as well as a new music room with acoustical wall panels, deflectors, and an instrument storage area.

In order to satisfy the MSA’s Owner Controlled Insurance Program on this CMaR project, CAM deployed a cloud-based workforce visibility platform known as “Eyrus”. This software aided our team’s efforts in the field by monitoring all personnel that enters the site, while also serving as a manpower enforcement tool by tracking subcontractor attendance and labor hours on-site. This program enhanced the safety and security of this project by only allowing personnel to enter the LOD of the property if they had attended a safety orientation, passed a background check, and received a badge. CAM was able to accurately report on Local Resident and New Hire contributions to this project and efficiently manage the Certified Payroll Reporting process via GPS microchips placed in the hardhat of every employee. CAM, ownership, and all subs had access to a custom reporting dashboard on PC, mobile, or tablet, which allowed all parties to quickly retrieve project data and successfully meet these workforce development goals.

Notably, we launched within the peak of Covid, just a few months after the government shut down all non-essential businesses, and most other industries were fully working from home. CAM’s project management team had to get creative in order to keep the project within budget and maintain a tight schedule in the face of long material delays and the unavailability of a wide swath of common materials (metals, woods, plastics, resins, glues, chip-dependent products). This conversation began early during pre-construction, and we worked hard to pro-actively communicate with our architectural and engineering partners to convey the challenges we were seeing in real time. We worked diligently to identify alternative, substantially equivalent products, when possible, and served as a conduit between subcontractors’ suppliers and MSA/BCPS, as well as their design team. In some cases, adjustments were made to more readily-available materials and components. In instances where substitutions were not possible (ie: switchgear – with specialized breakers being imported from New Mexico), CAM had to exercise patience and find a way to work under suboptimal conditions (via temp services, generators, etc). Despite the building not having permanent power in place until 2 months prior to final delivery and occupancy, we were able to finish in time for the ribbon cutting and welcome the new student body population into the facility following the New Year’s holiday.

Robert Poole Building

The Robert Poole Building is home to The Academy for College and Career Exploration (ACCE) and The Independence School, a project within the 21st Century School Buildings Plan. Our team partnered with the Maryland Stadium Authority, Baltimore City Public Schools, & JRS Architects to provide pre-construction & construction services to this historic building.

This project renovates the original historic building and demolishes several later, outdated additions, replacing them with two new additions. Construction began in August 2016, and was completed for the start of school in August 2018. Key features include 72,044 sf of renovated space including the Media Center and CTE Labs, with another 63,852 sf of new construction. The new portion of the building contains a state-of-the-art Gymnasium, Art & Music Classrooms, and a Collaborative Learning Stair.

A dedicated entrance for community space leads to 1,980 sf featuring a large meeting room, career readiness room, food pantry, and a laundry center. In addition, there are two new greenhouses available for student use.

Thoughtful design allows for the building to maximize daylight in instructional areas, including the new collaborative learning areas, while there is a clear circulation path for wayfinding and security.

The renovated facility will gracefully transform an iconic building in the Hampden neighborhood into a true 21st century school.

Eastern Family Resource Center

 

The new, 80,000 sf, three-floor, LEED Silver Eastern Family Resource Center (EFRC) is located on the campus of Medstar Franklin Square Medical Center. This facility replaces and expands the previous shelter for men, women, and families, while containing the capability for an array of programs operated via Baltimore County Department of Health and Human Services.

With capacity for 330 residents, EFRC provides safe and stable transitional housing, dining, and educational resources for its residents. In addition, there are numerous health and medical capabilities, including: dental, clinical, audiology, and WIC services. The shelter space was designed around the specific needs of those who occupy the building, with childcare and child development areas, an outdoor playground, and program collaboration/flexible office space for partnering agencies.

The new building houses multiple Health Department functions, including the Infants and Toddlers Program, Substance Abuse Treatment, a Sexually Transmitted Infections clinic, Family Planning, and the Womens, Infants, and Children Supplemental Nutrition Program. Healthcare for the Homeless is also housed within EFRC, as they engage in a partnership with the County to allow for the expansion of primary care, behavioral health, and supportive health services.

Youth Education and Rehabilitation Center

 

The Youth Education and Rehabilitation Center (YDC) is a 81,000- square foot facility that houses 60 detainees and is located on Greenmount Avenue in Baltimore. Located at the northeastern corner of the Correctional Complex campus, the facility comprises new construction and renovated areas formerly occupied by the Baltimore Pre-Release Unit. The new construction was in place of the main facility of the Baltimore Pre-Release Unit, which was demolished for this project. The area that was renovated was part of a former warehouse building.

The YDC is a dedicated pre-trial facility for youths that provides the extensive support services required of a juvenile population, including a full educational program operated by Baltimore City Public Schools. The facility also includes medical and mental health as well as athletic/recreational spaces geared toward the specific needs of a youth population.

The pre-trial center will provide educational and service benefits to its occupants. This new center will provide the mandatory sight and sound separation from the adult population, while allowing the occupants to take part in an educational program operated via Baltimore City Public Schools. Before this facility, the youth population was detained with hardened criminals, as they awaited trial without the ability to take part in educational and rehabilitative services.

The educational wing separates the school from housing, which will increase a sense of normalization for the youth population. With spaces like state-of-the-art classrooms, a full-sized gymnasium, art-room, media center, and collaboration centers, this facility will focus on educating and rehabilitating rather than just housing its occupants.

The building offers the ability to provide a full assortment of medical servicing capabilities. The facility includes a medical infirmary, full dental clinic, exam rooms, isolation rooms, psychology and behavioral health services and dialysis, and a spacious waiting area within the medical wing. This medical/health wing was designed and constructed around the specific needs of a juvenile population.

The facility achieved LEED Gold certification. A few of the integrated sustainable features include urban site selection and site density, reduction of water usage, a highly efficient building envelope, high-performance HVAC systems, efficient LED lighting sources, and recycled or readily renewable materials and finishes.

 

 

Hereford HS Renovation & Addition

This 188,000 square foot renovation and addition project was scheduled for twelve distinct phases and necessitated double shift work for over two years. The tightly scheduled project also  remained occupied throughout its duration.

Due to the complexity of the job, the aggressive schedule and the sheer acreage of the facility, CAM managed the renovation, the addition, the site work and the creation of a new pre-treatment waste water facility as four individual sub projects. Each of these sub projects had its own shifts and crews.

For nearly the entire duration of the project, the renovation required that CAM work two full shifts during all times when the school was closed to mitigate any impact to the administration and student population. The day shift proceeded form 7 a.m. to 3:30 p.m. while the second shift worked from 3 p.m. to 11 p.m. The second shift included an entirely different workforce and superintendent who worked closely in concert with the day shift superintendent.

This twelve-phased 143,000 square foot renovation included remediation of asbestos and removal and disposal of PCB ballasts. Renovations also included demolition throughout the school, installation of all new finishes and fixtures, new casework and classroom accessories and work to the mechanical, sprinkler and electrical systems.  Tightly coordinated phasing mandated that work be completed for the students to return to the renovated classrooms in accordance with the schedule. Parts of the building were vacated during breaks which allowed for unimpeded progress in some areas.

The addition was primarily constructed during the day shift.  It consisted of a new three-story, 45,000 square foot building with a cafeteria and STEM science addition. The addition is connected to the existing building via a new enclosed second floor bridge link.  The new structural steel, brick and cast stone structure also creates the new feature entry into the school.  Upon completion of the new addition and entry, the school moved into the new spaces while the renovations and site work continued.

The addition includes a new cafeteria with a full service kitchen, pantry and serving areas, eleven new Biology classrooms, Chemistry and Physics laboratories with prep and storage rooms, restrooms, offices and circulation areas.  Science casework, shelving and fume hoods as well as extensive IT requirements differentiate these spaces from typical high school classrooms.  A new HVAC system was also installed that includes a two pipe chilled water system and boiler.

The site work on this 270 acre facility was also primarily performed during normal working hours.  Additional night shifts were incorporated during work which required tying in to the existing electrical infrastructure. Site work also included extensive grading, paving for roadways and parking lots, and the installation of utilities and drain fields.

Twelve new storm water management ponds were also installed adjacent to five athletic complexes all of which needed to remain operational throughout the school year and for scheduled recreation programs during the summers and school breaks.

The fourth sub-project represented the construction of a new waste water/pre-treatment facility. The facility has the capability of handling 10,000 gallons/day.  In addition to serving the school as a waste water treatment plant, the building also serves to house and care for livestock associated with the school’s agricultural program.

During the entire project CAM managed logistical challenges as well.  Since there was only a single entry and exit to the school and site, deliveries were tightly coordinated with the 40 school buses and student and staff vehicular traffic. Materials for the project could only be received during specific windows of time which varied with the school’s event calendar.

Despite nearly three years of continuous construction activity, major school activities including concerts, proms and athletic activities were incorporated into the schedule and proceeded without interruption.

Waverly Elementary/Middle School

The new award winning Waverly PreK-8 School is a multi-phased, 3 story 130,000 square foot building including an 11,000 square foot underground parking garage. This LEED Gold Project was the first new Baltimore City School built in decades.

Special LEED features included a green vegetative roof, sunshades, extensive use of natural lighting, and high efficiency building systems. Post bid, CAM was requested to add Solar Panels to the facility, and in a design build delivery, ultimately chose to utilize roofs on both Phase 1 & 2 structures to optimize exposure.

The school houses an extensive media center, and a three story feature atrium entry which separates the cafeteria/auditorium and kitchen for community uses.

Architectural features include curved drywall and sloped acoustical ceilings, multiple styles of metal panels, a barrel vault metal roof, and two large skylights which provide natural lighting into the building core. Special attention was provided in this very tight occupied site to safely transition the middle and elementary students into this new facility.

Phase 1 of the new school has been constructed directly adjacent to the existing occupied elementary school and just across the street from the existing middle school and nearby residences.

Upon the completion of Phase I the elementary and the middle school students and administrators relocated into the new building during the winter break.

Dedication of the Phase 1 part of the school was held in early April 2014 and attended by the Governor, Mayor and other high ranking City officials who celebrated the first project being constructed under the City Schools’ aggressive program to improve their educational facilities.

Phase 2 added additional classrooms as well as a new gymnasium. The exterior of the gymnasium is adorned by relief art panels.